Project case study

Hull | A difficult junction, solved

A 144-fibre installation completed in two hours, avoiding potential permitting delays.

Hull · 100 m overblow · 144-fibre 6 mm ETC cable · existing 25 mm BFT

The challenge

A contractor could not pull new microduct through a congested route beneath a busy four-way junction. A collapsed section and further permitting threatened the deadline.

Our approach

Blow & Go used specialist overblowing techniques to install the fibre through the existing route.

The result

The installation was completed in two hours from arrival to departure, avoiding the anticipated delay of further permits.

Need help with a similar project?

From initial advice to installation, testing and commissioning. Your customer. Your relationship. Our fibre expertise.