Voneus | Critical network restoration

Following a major cable strike, most customers were restored within 12 hours.

Whinfell, Cumbria · 1.2 km ABF bundle · 12-fibre Stingray

The challenge

A cable strike in March 2023 took a rural broadband network offline. The remote route required rapid access to suitable replacement fibre. The damaged cable was the part of a backbone for thousands of customers so needed a priority fix

Our approach

Blow & Go mobilised in under 60 minutes, with the required fibre available from stock, and reached the site within hours. Getting to the blow point was challenging it was in a difficult to reach field at the endge of a forest.

The result

Customers were back online within 12 hours of the incident.